首页> 外文会议>ASCE Pipeline Division's international conference >Delivering a Critical Raw Water Transmission Line Using Design-Build; The Perspective from Gilbert of Gilbert, AZ
【24h】

Delivering a Critical Raw Water Transmission Line Using Design-Build; The Perspective from Gilbert of Gilbert, AZ

机译:使用设计建造交付关键的原水传输线;亚利桑那州吉尔伯特的吉尔伯特的观点

获取原文

摘要

The Town of Gilbert, AZ, needed to meet the potable water demands of their existing and future customers. One water resource strategy was to utilize their Colorado River water allocation and build a new water treatment plant (WTP). This entailed constructing a 13-'/2 mile, 48-inch diameter pipeline to convey raw water from the Central Arizona Project (CAP) Canal to the San Tan Vista WTP. Gilbert's major challenges included:1.Complete the project within 30 months to allow the WTP to be commissioned prior to the 2009 warm weather, high water use season.2.Only one mile of the pipeline could be routed within Gilbert's boundaries; the remainder required use permits, right-of-way (ROW), or easements from over 200 public agencies and private landowners in adjacent communities.3.Meet the budget agreed to by Gilbert and the City of Chandler, an equal partner in the project.To complete the $37 million pipeline on schedule, Gilbert chose Design-Build (DB) as the project delivery method. Gilbert also selected a Project Management/Construction Management (PM/CM) consultant to lead the project. This method proved successful for Gilbert and included several innovative elements:4.Task the DB Team to take the lead in obtaining the necessary right-of-entry, ROW, and/or easements from over 200 public and private landowners.5.Negotiate multiple guaranteed maximum prices (GMP) with the DB Team to provide flexibility in executing the work to meet the schedule while providing the best value for Gilbert and Chandler.6.Empower the DB Team to use their creativity to obtain the best value. This included (1) completing a pipeline routing study that determined the preferred alignment using both monetary and non-monetary criteria, and (2) using Ductile Iron Pipe (DIP) instead of an alternate with a 27% lower material cost because DIP resulted in a lower installed cost.
机译:亚利桑那州吉尔伯特镇需要满足其现有和未来客户的饮用水需求。一种水资源战略是利用他们在科罗拉多河的水资源分配,并建造一个新的水处理厂(WTP)。这需要修建一条13'/ 2英里,直径48英寸的管道,以将原水从中央亚利桑那项目(CAP)运河输送到San Tan Vista WTP。吉尔伯特的主要挑战包括:1.在30个月内完成该项目,以使WTP能够在2009年温暖天气,高用水季节之前进行调试。2。吉尔伯特边界内只能铺设一英里的管道;其余要求的使用许可,通行权(ROW)或相邻社区的200多个公共机构和私人土地所有者的地役权3.达到项目的同等伙伴吉尔伯特和钱德勒市商定的预算为了按期完成3,700万美元的开发计划,Gilbert选择了Design-Build(DB)作为项目交付方式。吉尔伯特还选择了项目管理/施工管理(PM / CM)顾问来领导该项目。这种方法对吉尔伯特(Gilbert)证明是成功的,并包括以下几个创新要素:4。责成数据库团队带头从200多个公共和私有土地所有者那里获得必要的进入权,ROW和/或地役权5。与DB团队一起保证最高价格(GMP),以灵活地执行工作以满足时间表,同时为Gilbert和Chandler提供最佳价值。6。增强DB团队的创造力,以获取最大价值。其中包括(1)完成一项通过货币和非货币标准确定首选路线的管线研究,以及(2)使用球墨铸铁管(DIP)替代替代方案,从而降低了27%的材料成本,因为DIP导致较低的安装成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号