首页> 外文会议>ASCE Pipeline Division's International Conference >STOCKTON DELTA WATER PROJECT CONSTRUCTION CHALLENGES
【24h】

STOCKTON DELTA WATER PROJECT CONSTRUCTION CHALLENGES

机译:Stockton Delta水项目建设挑战

获取原文

摘要

The City of Stockton Municipal Utilities Department has completed their Delta Water Supply Project (DWSP) at a cost of $200 million. This progressive design build project was completed by CDM Constructors, Inc. (CCI) as the prime contractor for the project. The project includes more than 12 miles of a 54-inch diameter raw water pipeline that will transport surface water from the San Joaquin River to the new 30-million-gallon-per-day (mgd) treatment plant. More than 7 miles of 36- and 54-inch-diameter treated water pipelines connect the new water treatment plant to the city's existing distribution system. The pipeline construction involved several challenges including difficult soil conditions, groundwater dewatering and tunnel crossings of major canals, interstate highway, railroad and major roadways.
机译:斯托克顿市公用事业部门已以2亿美元的价格完成其三角洲供水项目(DWSP)。该渐进式设计构建项目由CDM Constructors,Inc。(CCI)作为项目的主要承包商完成。该项目包括超过12英里的54英寸直径的原水管道,将从圣何国河到新的3000万加仑(MGD)治疗厂的地表水。超过7英里的36-和54英寸直径处理的水管道将新的水处理设备连接到城市的现有分销系统。管道建​​设涉及几种挑战,包括困难的土壤条件,地下水脱水和主要运河隧道交叉口,公路州际公路,铁路和主要道路。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号