STOCKTON DELTA WATER PROJECT CONSTRUCTION CHALLENGES

机译:斯托克顿三角洲水利工程项目的建设挑战

获取原文

摘要

The City of Stockton Municipal Utilities Department has completed their Delta Water Supply Project (DWSP) at a cost of $200 million. This progressive design build project was completed by CDM Constructors, Inc. (CCI) as the prime contractor for the project. The project includes more than 12 miles of a 54-inch diameter raw water pipeline that will transport surface water from the San Joaquin River to the new 30-million-gallon-per-day (mgd) treatment plant. More than 7 miles of 36- and 54-inch-diameter treated water pipelines connect the new water treatment plant to the city's existing distribution system. The pipeline construction involved several challenges including difficult soil conditions, groundwater dewatering and tunnel crossings of major canals, interstate highway, railroad and major roadways.
机译:斯托克顿市公用事业部已经完成了其三角洲供水项目(DWSP),耗资2亿美元。 CDM Constructors,Inc.(CCI)作为该项目的主要承包商完成了该渐进式设计建造项目。该项目包括一条超过12英里长,直径为54英寸的原水管道,该管道将把地表水从圣华金河输送到新的日处理3000万加仑的污水处理厂。直径超过36英寸和54英寸的7英里以上的自来水管道将新的水处理厂连接到城市的现有配水系统。管道建​​设面临诸多挑战,包括艰难的土壤条件,地下水脱水和主要运河,州际公路,铁路和主要道路的隧道穿越。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号