首页> 外文会议>ICEEP 2012 >The Application of Costs and Benefits Analysis in Coastal Land-Reclamation
【24h】

The Application of Costs and Benefits Analysis in Coastal Land-Reclamation

机译:成本与益处分析在沿海垦区中的应用

获取原文

摘要

Today, the coastal areas of the world amounting to nearly 10% of the total world's land area, supports nearly half of the world's human population. This causes serious population pressure and environmental problems. To reduce the pressure of land scarcity, cities along the coastal land are now paying their attention to land reclamation. Although land reclamation results in significant benefits to the coastal cities, it simultaneously causes serious environmental problems. Therefore, satisfactory management of reclaimed land is a big challenge which governments are now facing. Based on economics, this article presents some economic means to efficiently manage coastal areas. Integrating the costs-benefits analysis and input-output table, this paper builds the "costs-benefits analysis system", and provides the models of estimating the value of some main aspects of the costs. Through outcome consult method, shadow price, TCM (Travel Cost Method), CVM (Contingent Valuation Method) and other methods, one can appraise the ecological damage in monetary terms, which allows to transform questions of "yes" or "no" into questions of "more" or "less", one can easily judge the feasibility of this project in terms of social benefits. Using this costs-benefits analysis system to assess the land reclamation in Gulei port, Zhangzhou, China, the outcome showed that the total costs were almost 3.4 times more than the benefits, meaning that it is really not beneficial to construct the project from economics point of view.
机译:今天,世界额达沿海地区近10%,占世界陆地面积的,支持几乎一半的世界人口的。这会导致严重的人口压力和环境问题。为了减少土地稀缺的压力,沿海城市的土地现在支付他们的注意开荒。虽然开荒导致显著造福于沿海城市,它同时造成了严重的环境问题。因此,填海土地满意管理是各国政府目前面临的一大挑战。基于经济学,本文提出了一些经济手段来有效地管理沿海地区。集成的成本效益分析和投入产出表,本文建立了“成本 - 收益分析系统”,并提供估计的成本的一些主要方面的价值的车型。通过成果咨询法,影子价格,TCM(旅行费用法),CVM(CVM法)等方法,可以评价以货币形式的生态破坏,这使得改造的“是”或“否”成问题的问题“多”或“少”,人们可以很容易地判断在社会福利方面该项目的可行性。使用这种成本效益分析制度,以评估在菇蕾端口开荒,漳州,中国,结果显示,总成本比效益更近3.4倍,这意味着它是真的不利于构建从经济学角度项目看法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号