ONGC's C-Series Trunk Pipeline Commissioning

机译:ONGC的C系列中继管道调试

获取原文

摘要

The C- Series marginal gas field in Tapti is located approx. 60 KM West of Daman. Under Phase-I implementation, four unmanned well platforms namely C-22P, C-24P, C-39-P1 & C-39-PA have been installed. C-39-PA is the farthest platform and connected to C-24P via 60 kms of 22" and C- 24P to NQG process platform via 115 kms of 28" sub-sea pipelines. Gas from NQG is transported to Uran after processing. Pipeline is very long sub-sea pipeline bearing a very typical profile with un-favorable contour having multiple sources, having a reverse profile with C-series platforms at a shallow depth of 19-23m and the receiving process platform NQG at a depth of about 64 m. The gas, condensate and liquid production profile makes this pipeline more critical during regular production and having severe surging problems. Dewatering and commissioning of the pipeline with a conventional approach to launch the pig train from the launcher at C-24 well platform and receiving the pig train at NQG receiver was considered initially. The pipeline filled with 60 thousand cubic meters of treated water. If pigging is done conventionally huge surges are anticipated at NQG, may cause process upset and may lead to shutdown of the process complex. Because of this a different way of launching the pig from receiver end i.e., (NQG), deeper pipeline profile and receiving the pig at C-24 platform, a shallower pipeline to ensure safe and practicable operation. The pigging was done successfully with nitrogen in between the 4 pig train followed by gas. After pigging of NQO-C-24 section, gas from C-24 platform was used to propel the pigs in 22" pipeline segment. Finally, dewatering of both segments was carried out successfully and this is first time in ONGC, the operations carried out in a large scale.
机译:TAPTI中的C型边缘气田约为。达曼以西60公里。在阶段I实施下,已安装四个无人井平台即C-22P,C-24P,C-39-P1和C-39-PA。 C-39-PA是最远的平台,通过115公里的28“亚海管道,通过60公里和22英寸的C-24P和C-24P连接到NQG工艺平台。加工后,NQG的气体被运输到铀。管道是非常长的亚海管道,轴承非常典型的轮廓,具有不利的轮廓,具有多个源,具有与C系列平台的反向曲线,在浅度为19-23M的浅深度,并且接收过程平台NQG在约约64米。气体,冷凝水和液体生产型材使得该管道在经常生产过程中更为关键,并且具有严重的浪涌问题。用常规方法脱水和调试,以传统的方法在C-24井平台上从发射器发射猪火车,并最初被认为是在NQG接收器处接收猪火车。管道充满了6万立方米的处理水。如果在NQG期间预期巨大的浪涌,则预期巨大的浪涌可能导致过程镦粗,并且可能导致过程复合物的关闭。由于这种不同的方式从接收器末端发射猪,(NQG),更深的管道轮廓并在C-24平台上接收猪,较浅的管道,以确保安全和可行的操作。在4个猪火车之间用氮气成功完成,然后是气体。在卸下NQO-C-24段之后,使用来自C-24平台的气体在22“管道区段中推动猪。最后,两段的脱水成功进行,这是在ONGC中首次进行的操作大规模。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号