首页> 外文会议>International Conference on Civil, Architectural and Hydraulic Engineering >The Construction Monitoring and Data Analysis of The Zhang JiaQu Tunnel
【24h】

The Construction Monitoring and Data Analysis of The Zhang JiaQu Tunnel

机译:张家电隧道的施工监测与数据分析

获取原文

摘要

The monitoring measurement on-site, which monitors the stability of surrounding rock and tests the rationality of design, is an indispensable mean. In the process of construction, the Zhang Jiaqu tunnel is open, by monitoring the whole section, guiding and determining the construction time of secondary lining and mastering the working state of primary supporting. This paper introduces the main content of monitoring measurement and analyzes the monitoring data, so as to provide the reference for similar projects.
机译:在现场监测测量,监测周围岩石的稳定性并测试设计的合理性,是一种不可或缺的平均值。在施工过程中,张继电隧道通过监测整个截面,引导和确定二次衬里的施工时间并掌握初级支撑的工作状态。本文介绍了监控测量的主要内容,并分析了监控数据,以便为类似项目提供参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号