首页> 外文会议>International Conference on Civil, Architectural and Hydraulic Engineering >Study on post-earthquake corrective repair of the stone archway and stone screen in Tiantai Mountain
【24h】

Study on post-earthquake corrective repair of the stone archway and stone screen in Tiantai Mountain

机译:天台山石拱门和石碑后地震矫正修复研究

获取原文

摘要

The Qionglai stone archway and stone screen wall are located in Tiantai Mountain, Sichuan Province. Due to the impact of the 5.12 Wenchuan earthquakes, the stone archway began to subside and tilt. The maximum settlement of the two columns in the northeast was 60mm and the vertical deviation was 42mm. The main ridge of the roof which was badly damaged was out of joint and began to fracture, shift and fragment. Other part also got damaged in varying degrees. Due to the special geographical environment, large-scale machinery cannot be put into use. Thus, we can only use small equipment and labor, take advantage of pulley block and set up a steel hoop to improve pillars with jacking and corrective method. At the time of repairment, it should follow the principle of "repair the old as not to change the original appearance" and use the original materials and follow the original process as much as possible so that the stone archway and stone screen wall can be in the original shape.
机译:Qionglai Stone Archway和Stone Screen墙位于四川省天台山。由于5.12汶川地震的影响,石拱门开始消退和倾斜。两列在东北部的最大沉降为60mm,垂直偏差为42mm。严重受损的屋顶的主脊不关节,开始裂缝,转变和碎片。其他部分也因不同程度而受损。由于特殊的地理环境,大型机械不能投入使用。因此,我们只能使用小型设备和劳动力,利用滑轮块,并建立钢箍,以提高支柱和矫正方法。在修理时,它应该遵循“修理旧的原件”的原理,并使用原材料尽可能遵循原来的工艺,使石拱门和石材墙可以进入原始形状。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号