首页> 外文会议>Global Congress on Process Safety >Applications of Cause-Consequence Diagrams in Operational Risk Assessment
【24h】

Applications of Cause-Consequence Diagrams in Operational Risk Assessment

机译:原因后果图在操作风险评估中的应用

获取原文

摘要

Cause-Consequence Analysis (CCA) is emerging to be a very useful tool to depict and maintain an up-to date, real-time working risk management system embedded in daily operations. Bowtie diagrams (bowties) are a less formal CCA that provide a pictorial representation of the risk assessment process [1]. The authors believe that bowties are a resourceful tool to improve performance of the hazard identification and risk assessment process (HIRA) in process industries, to demonstrate that major hazards are identified and managed to as low as reasonably practicable (ALARP).
机译:原因 - 后果分析(CCA)正在出现是一个非常有用的工具,可以描绘和维护嵌入日常运营中的最新实时工作风险管理系统。 Bowtie图(Bowties)是一个较不佳的CCA,提供风险评估过程的图示陈述[1]。作者认为,Bowties是一种充满高兴的工具,可以提高危险识别和风险评估过程(Hira)在过程行业中的绩效,以证明主要危害被确定和管理到合理切实可行(ALARP)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号