首页> 外文会议>International Conference on Innovation in Mine Operations >Precast structures for draw point in block/panel caving
【24h】

Precast structures for draw point in block/panel caving

机译:砌块/面板洞穴中绘制点的预制结构

获取原文

摘要

One of the main issues in mining preparation refers to the civil mining constructions, as a requirement for the operation of underground mines, which show different problems. Some underground mining problems are caused by the conditions of the mine, like the presence of sulphated water and others are logistical, such as the hardening of the concrete, interference with other operations and congestion on transport routes as a result of limited space. Taken together, the possibility of all of these problems make building inside the mine a process with multiple opportunities for improvement, looking for a reduction in time and eventually the costs of the mining constructions.
机译:采矿准备中的主要问题之一是指民事采矿结构,作为地下矿井的运作要求,这些建设表现出不同的问题。一些地下挖掘问题是由矿井的条件引起的,就像硫化水的存在,其他是物流的,如混凝土的硬化,由于空间有限而在运输路线上干扰其他操作和拥堵。在一起,所有这些问题的可能性使得在矿井内部建造一个具有多种改进机会的过程,寻找减少的时间,最终是采矿结构的成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号