Primary Engineering Geological for Shuibuya Underground Power Station and Their Treatment

机译:水谷地下发电站初级工程地质及其治疗

获取原文

摘要

The Shuibuya hydropower station is located in Badong County in the middle reach of Qingjiang River. It is the first cascaded project in Qingjiang mainstream. The Project consists of a concrete faced rock fill dam (CFRD), underground power house, chute spillway on the left bank, and the sluice tunnel on the right bank. The dam is 233m high, which is the highest of its kind in the world at present. The installed capacity and annual output of Shuibuya Power Plant are 4×460MW and 3.92 GWh respectively. The rock mass of foundation of Shuibuya project is a type of stratified sedimentation rock mass is composed of interbedded stratum by weak layers and hard layers. To solve engineering geological problem is difficult and challenging. For example, the intake slope of Shuibuya hydropower diversion tunnel was a landslide, and diversion tunnel outlet is located at the toe of Maya slope with 360m high, rock mass of the underground powerhouse caverns are soft and hard rock inter-layered, with multi-structural planes, multi-shear zones, and the lithology of rock is highly krast. Some researchs and geological treatments were performed during the geological exploitation and construction, which is fundamental and primary.
机译:Shuibuya水电站位于巴东县,位于青江中部。它是青江主流的第一个级联项目。该项目包括一个混凝土面岩填充水坝(CFRD),地下电力房,左岸的雪螺溢洪道,右岸的水闸隧道。大坝高233米,目前是世界上的最高种类。 Shuibuya发电厂的装机容量和年产量分别为4×460mW和3.92 GWH。石谷项目基础的岩石质量是一种分层沉降岩体,由弱层和硬层组成由底层和硬层组成。解决工程地质问题是困难和具有挑战性的。例如,水武亚水电转移隧道的进气坡是一个滑坡,转移隧道出口位于玛雅坡脚趾,带360米的岩石岩石岩石岩体柔软,硬岩层间柔软,多 - 结构平面,多剪切区和岩石的岩性高克拉斯特。在地质剥削和建设期间进行了一些研究和地质治疗,这是基本和初级的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号