首页> 外文会议>International Conference on Technology of Architecture and Structure >The Construction Measure Control Technology of the pylon of Sutong Bridge
【24h】

The Construction Measure Control Technology of the pylon of Sutong Bridge

机译:萨贡桥塔的施工措施控制技术

获取原文

摘要

In this paper, the operating methods that the total station and the GPS as well as other equipments are employed to carry out the construction measure control have been briefly described, which have well met the needs of tower column, beams, supports and others as well as had the higher lofting precision and the obvious operating efficiency in the process of the pylon's construction measure of Sutong Bridge. At the same time, they have also provided the technical reference for other similar projects.
机译:在本文中,采用总站和GPS以及其他设备进行施工测量控制的操作方法已经简要描述,这也很好地满足了塔柱,梁,支撑和其他的需求如幽门桥梁施工措施的过程中具有较高的Lofting精度和明显的操作效率。与此同时,他们还为其他类似项目提供了技术参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号