首页> 外文会议>Global Conference on Civil, Structural and Environmental Engineering >Comparison and analysis on self-balanced method and anchored pile method in Qingdao Gulf Bridge
【24h】

Comparison and analysis on self-balanced method and anchored pile method in Qingdao Gulf Bridge

机译:青岛海湾桥自平衡法和锚定桩法的比较与分析

获取原文

摘要

Based on the situ results of Self-balanced Method and Anchored Pile Method on the piles of Qingdao Gulf Bridge, the test method of them have been contrasted in same cite. Compared with anchor piles method the self-balancing test is simple way which saves money and time. And the load-displacement curve obtained from the self-balanced test is closed to anchored pile test;;from the view of the sides shear resistance, the side resistance below the load cell in Self-balanced Method is less than the value in Anchored Pile Method while the value under the load cell is more than it. The proportion which tip resistance occupied in self-balancing test is more than the traditional anchor piles method, it should be considered in pile design.
机译:基于自平衡方法的原位结果和堆积桩在桩桩上的青岛海湾桥梁中,它们的试验方法在相同的举射中形成对比。与锚桩相比,自平衡测试是简单的方式,节省了金钱和时间。从自平衡测试获得的负载 - 位移曲线关闭到锚固桩试验;从剪切电阻的视图,自平衡方法中称重块下方的侧电阻小于锚固桩中的值方法虽然加载单元下的值超过它。在自平衡测试中占据的尖端电阻的比例超过了传统的锚固桩方法,应该考虑在桩设计中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号