首页> 外文会议>ISRM international young scholars' symposium on rock mechanics >Feasibility analysis on 1300 fully-mechanized coal mining face of Jining No.2 Mine during exploitation approaching to faults and its optimization design
【24h】

Feasibility analysis on 1300 fully-mechanized coal mining face of Jining No.2 Mine during exploitation approaching to faults and its optimization design

机译:津津机济宁2号矿井煤矿煤炭矿面的可行性分析及其优化设计

获取原文

摘要

The primary influence factors of layout of 1300 fully-mechanized coal mining face are Balipu Fault, F24 Fault and the accumulated water in mined-out areas of No. 1 Mine Area in Jining No.2 Mine. According to the analysis of geology and hydrographical geology of the mining area, and combined with "Water Prevention Regulation of Coal Mines" and related achievements in scientific research, the mining feasibility of 1300 fullymechanized coal mining face was studied. Through economy comparison, the design of mining stope and water prevention was optimized, 0.8 million tons coal resource can be recovered.
机译:1300齐全的煤炭矿面布局的主要影响因素是Balipu故障,F24故障和济宁第2号矿区矿区矿区的累积水。根据矿区地质和水文地质地质的分析,并结合“煤矿防水调控”及科学研究的相关成果,研究了1300名全力机械煤炭采矿面的采矿可行性。通过经济比较,优化采矿及防水的设计,可以恢复08万吨煤炭资源。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号