According to the phases-subsequent filling method in large iron ore of southern district Sijiaying, the current conditions of ore body and requirement of mining are analyzed in detail. By taking into account of factors such as protection of water resources and environmental, control of rock movement, efficient and large-scale mining, deceasing of losses and dilution, the stope structure optimization is carried out. After analysis on the main factors of economy and security, the value range and constraint conditions are defined, and a series of threedimensional numerical analysis are performed. By regression analysis, the functional relationship between mining safety-rock movement parameters and the design parameters are achieved. By solving the optimization model, the optimization structural parameters of the stope are obtained.
展开▼
机译:根据Southern District Soutijiad的阶段填充方法,详细分析了矿体的当前条件和采矿要求。通过考虑到水资源保护等因素,控制岩石运动的控制,高效和大规模的挖掘,损失的死亡和稀释,进行了缩小结构优化。在分析经济和安全性的主要因素之后,定义了值范围和约束条件,并进行了一系列三维数值分析。通过回归分析,实现了采矿安全岩运动参数与设计参数之间的功能关系。通过求解优化模型,获得了缩放的优化结构参数。
展开▼