【24h】

A Multiple Dam System Strategy for Zambezi River

机译:赞同Zambezi河的多水坝系统策略

获取原文

摘要

In this paper, we removing the Kariba Dam and replacing it with 18 smaller dams along the Zambezi river. Furthermore, we set up three progressive models - the cascade dam system model, the long-term optimal dispatch of the new system model, and the successive linear programming optimal scheduling model, to construct and analysis the new multiple dam system, aiming at keeping a reasonable balance between safety and costs. The whole work is based on a more protective and efficient hydropower system. At last, we provide a strategy for modulating the water flow through the new system dams. Meanwhile, a comprehensive guidance to the ZRA managers against extreme conditions are also offed in our conclusion.
机译:在本文中,我们沿着赞美河沿着拉米河沿着18个较小的水坝替换卡里巴大坝。此外,我们设置了三种渐进模型 - 级联水坝系统模型,新系统模型的长期最佳调度,以及连续的线性编程最佳调度模型,构建和分析新的多坝系统,旨在保持一个安全性和成本之间的合理平衡。整个工作都是基于更具保护性和有效的水电系统。最后,我们提供了一种通过新系统水坝调制水流的策略。与此同时,我们结论的结论也消失了对ZRA管理人员的全面指导。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号