首页> 外文会议>International Conference on Civil Engineering, Architecture and Building Materials >Site Monitoring Analysis of Influence of Excavation And Construction of a Unsymmetrical Loading Twin-arch Tunnel
【24h】

Site Monitoring Analysis of Influence of Excavation And Construction of a Unsymmetrical Loading Twin-arch Tunnel

机译:挖掘机挖掘机影响的现场监测分析,并进行非对称装载双拱隧道的构建

获取原文

摘要

Unsymmetrical loading twin-arch tunnel which has its own characteristics is different from the general separated tunnel. This paper takes a unsymmetrical loading twin-arch tunnel as the background, supervises the tunnel and clears up and analyzes the monitoring data. The results shows: (1) The subsidence of arch crown grows with section excavation, it diminishes gradually and tends to be stable in the initial stage of support and the complete stage of inverted arch. (2) The convergence pre-day of tunnel surrounding rock increases and becomes stable until the lower inverted arch has finished in the effect of unsymmetrical loading and excavation. (3) The surface position of tunnel midline is the most significant position of excavation influence. (4) Unsymmetrical loading makes the lining and middle wall become dislocated, and cracks and peeling phenomenon appears. These conclusions can provide reference for slope design, construction process and site monitoring for unsymmetrical loading twin-arch tunnel under similar conditions.
机译:不对称装载双拱隧道,其具有其自身特性不同于通用分离隧道。本文采用了一个不对称的双拱隧道作为背景,监督隧道并清除并分析监控数据。结果表明:(1)拱冠沉降随剖面开挖而生长,它逐渐减少,在初始支撑阶段和倒拱的完整阶段趋于稳定。 (2)隧道周围岩石的收敛前增加,直到下倒拱在不对称负载和挖掘的效果中完成。 (3)隧道中线的表面位置是挖掘影响最大的位置。 (4)不对称载荷使衬里和中壁变得脱离,出现裂缝和剥离现象。这些结论可以在类似条件下为不对称装载双轴隧道的斜坡设计,施工过程和现场监测提供参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号