首页> 外文会议>International Conference on Civil Engineering, Architecture and Building Materials >The Analysis of Fu Longping Double-Decked Tunnel With 3D Finite Element
【24h】

The Analysis of Fu Longping Double-Decked Tunnel With 3D Finite Element

机译:3D有限元富龙台双层隧道的分析

获取原文

摘要

The article analyzed the forced state of the surrounding rock and the tunnel lining for Fu longping double-decked tunnel by the Elasto-plastic finite element method. In the analysis, DP's yield criterion was employed for the elasto-plastic characteristics of materials. It studied the construction method with the theory, and guided the construction for the double-decked tunnel, too.
机译:本文通过弹塑性有限元法分析了富隆坡双层隧道的围岩和隧道衬砌的强制状态。在分析中,采用DP的产量标准用于材料的弹性塑性特性。它研究了该理论的施工方法,也引导了双层隧道的建设。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号