首页> 外文会议>International Conference on Civil Engineering, Architecture and Building Materials >Research of Vertical Prestressed Losses During Construction Process of PC Continuous Box Girder Bridge
【24h】

Research of Vertical Prestressed Losses During Construction Process of PC Continuous Box Girder Bridge

机译:PC连续箱梁桥梁施工过程中垂直预应力损失研究

获取原文
获取外文期刊封面目录资料

摘要

Based on a box girder bridge in an actual highway project, in-situ tests are carried out to understand the real stress state of vertical prestressed tendon. Researches of vertical prestressed losses during construction have been made in this paper. What is more, the regular pattern between the effective stress and time is proposed. Meanwhile, an efficient method which could control the prestressed losses is introduced. Eventually, it is aimed to conduct the construction of vertical prestressed tendons and improve the quality of tensioning. It also could provide a reference for design and quality control of vertical prestressed tendons in the similar type of bridges.
机译:基于一个实际公路项目的箱梁桥,进行了原位测试,了解垂直预应力肌腱的真正应力状态。本文取得了施工期间垂直预应力损失的研究。更重要的是,提出了有效应力和时间之间的规则模式。同时,介绍了一种可以控制预应力损失的有效方法。最终,它旨在开展垂直预应力肌腱的构建,提高张紧质量。它还可以为类似类型的桥梁中的垂直预应力肌腱的设计和质量控制提供参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号