Analysis on seepage effects of plastic concrete cut-off wall in construction and operation period of hydropower station tail channel

机译:水电站尾气施工期塑料混凝土截止墙渗流效应分析

获取原文

摘要

By numerical calculation, it analyzed the seepage effects of plastic concrete cut-off wall in in construction period. On construction period, the seepage flow from inside of channel to outside at unit length is 0.753m~3/h. The seepage flow from under plastic concrete cut-off wall is 0.646m~3/h which is 85.79% of total seepage flow. Under certain condition on operation period, the seepage flow from inside of channel to outside at unit length is 0.394m~3/h. The seepage flow from under plastic concrete cut-off wall is 0.358m~3/h which is 90.86% of total seepage flow. Under another condition on operation period, the seepage flow from inside of channel to outside at unit length is 0.249m~3/h. The seepage flow from under plastic concrete cut-off wall is 0.236m~3/h which is 94.78% of total seepage flow. In It showed the plastic concrete cut-off wall has obvious effect.
机译:通过数值计算,分析了施工时期塑料混凝土切断墙的渗流效应。在施工期间,渗流从通道内部流向外部的单位长度为0.753m〜3 / h。从塑料混凝土截止壁下的渗流流量为0.646m〜3 / h,占总渗流流量的85.79%。在一定条件下在操作期间,渗流从通道内部流向单位长度为0.394m〜3 / h。从塑料混凝土截止壁下的渗流流量为0.358m〜3 / h,渗漏流量的90.86%。在操作周期的另一个条件下,渗流从通道内部流入单位长度的外部为0.249m〜3 / h。从塑料混凝土截止壁下的渗流流量为0.236m〜3 / h,占总渗流流量的94.78%。在它显示塑料混凝土切断墙具有明显的效果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号