首页> 外文会议>International Conference on Civil Engineering, Architecture and Building Materials >Construction Simulation and Construction Speed Analysis of Natural Draft Cooling Towers
【24h】

Construction Simulation and Construction Speed Analysis of Natural Draft Cooling Towers

机译:天然冷却塔的建设仿真与施工速度分析

获取原文

摘要

Using the finite element code ABAQUS and taking account of the wind load reduction, this paper presents a set of construction simulation methods of concrete cooling towers. A natural draft cooling tower at Taishan nuclear power station in Guangdong province, China, under three speeds of construction is simulated. Displacement and stress distributions of the cooling tower in the different construction stages are obtained. Some interested parts of the cooling tower are analyzed in detail and the variations of displacements and stresses of these parts with the construction are concluded. A comparative study of the influence of construction speed on displacements and stresses is performed as well. The analyses and proposals of this paper may be used as reference to the cooling tower design and construction.
机译:使用有限元码ABAQUS并考虑到风负荷减少,本文介绍了一套混凝土冷却塔的施工仿真方法。中国广东省泰山核电站的一种天然冷却塔,施加了三种施工速度。获得了不同施工级中的冷却塔的位移和应力分布。详细分析了冷却塔的一些感兴趣的部分,并结束了这些部件的位移和压力的变化。还表现了对施工速度对位移和应力影响的对比研究。本文的分析和提议可用作对冷却塔设计和施工的参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号