This paper presents the technical, logistical, and scheduling challenges encountered to complete the demolition and ring replacement on a Natural Draft Cooling Tower during a 49 day outage. Works included pre-assembly and placement of sixty-four (64) pultruded structural fiberglass modules complete with a two level fire protection system. More than 150 workers logged 94,000 man-hours with zero safety incidents, completing the scope of work two (2) days ahead of schedule, thus allowing early plant restart and commissioning. The completed tower provides PPL Montour additional generation capacity while distributing 261,000 gpm, is 45 feet (13.7 m) high and over 400 feet (121.9 m) in diameter.
机译:本文介绍了在49天停运期间完成自然通风冷却塔的拆除和环更换所需的技术,后勤和调度方面的挑战。工程包括预装配和放置六十四(64)张拉挤结构玻璃纤维模块,并配有两层防火系统。超过150名工人记录了94,000个工时,安全事故为零,提前两(2)天完成了工作范围,因此可以提早重新启动工厂并进行调试。完工的塔架为PPL Montour提供了更多的发电能力,同时分配了261,000 gpm,高45英尺(13.7 m),直径超过400英尺(121.9 m)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号