首页> 外文会议>International Conference on Civil Engineering, Architecture and Building Materials >The direct solution on normal water depth of I type horseshoe tunnel with flat-bottom
【24h】

The direct solution on normal water depth of I type horseshoe tunnel with flat-bottom

机译:具有平底型马蹄隧道正常水深的直接解决方案

获取原文

摘要

I type horseshoe with flat-bottom evolved from standard I type horseshoe cross-section. It is composed of a flat-bottom and three arc sections. It is commonly applied in the field of hydroelectric engineering. The normal water depth computation equation for I type horseshoe cross-section with flat-bottom tunnel is a transcendental equation and no analytic solution. In this paper, based on the mathematics transformation for the basis equation and the relationship analysis between the dimensionless normal water depth and the relative parameters, a direct solution is established for the calculation of normal water depth for I type horseshoe cross-section with flat-bottom tunnel according to the fitting principle. This method overcomes the shortage of other iterative trial calculating methods, such as complex calculation step, depend on the special chart and curve, and existed serious error. The formula is simply and the maximum error is less than 0.3% under the general engineering design range (ratio of normal water depth and arch radius is between 0 to 1.4471). it can be used on the engineering designing practice and the edit of the handbook of hydraulic structure design.
机译:我用平底从标准I型马蹄形的横截面演进型马掌。它是由一个平底三个弧段。它在水电工程领域的普遍应用。正常水深计算式为I型马蹄形的横截面,平底隧道是一个超越方程和无解析解。在本文中,基于所述数学变换为基础方程和无量纲正常水深和相对参数之间的关系的分析,直接的解决方案,建立了正常水深计算I型马蹄形的横截面,flat-根据拟合原理底部隧道。此方法克服了其它迭代试验计算方法,如复杂的计算步骤的不足,取决于特殊图表和曲线上,并存在严重的错误。式是简单且最大误差是根据一般的工程设计范围小于0.3%(正常水深及圆弧半径比是1.4471 0之间)。它可以对工程设计实践和水工结构设计手册的编辑使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号