首页> 外文会议>International Conference on Structures and Building Materials(ICSBM) >Characteristics of Settlement and Assessment Methods of Engineered Structures under Certain High-speed Railway Tracks in China
【24h】

Characteristics of Settlement and Assessment Methods of Engineered Structures under Certain High-speed Railway Tracks in China

机译:中国某些高速铁路轨道设计成立与评估方法的特点

获取原文

摘要

The assessment of settlement deformation of engineered structures under high-speed railway tracks is an important control link in high-speed railway line construction. This paper discusses characteristics of settlement deformation of sections of subgrade, bridges and tunnels, and analyzes the suitability of predictive methods in currently available technical codes and standards based on measured data of settlement deformation. Currently available assessment analysis methods have good applicability for subgrade sections but are not suitable for sections of bridges and tunnels. Suitable assessment analysis methods are proposed and have been successfully applied to settlement deformation of engineered structures under the tracks of high-speed railway lines. The methods suit the characteristics of "small magnitude and large fluctuation" changes of measured settlement deformations taking account of the construction process of the engineered project.
机译:高速铁路轨道下工程结构沉降变形的评估是高速铁路线建设中的一个重要控制联系。本文讨论了路基,桥梁和隧道部分沉降变形的特点,并根据测量的沉降变形数据分析了目前可用的技术代码和标准的可预测方法的适用性。目前可用的评估分析方法对路基部分具有良好适用性,但不适用于桥梁和隧道的部分。提出了合适的评估分析方法,并已成功应用于高速铁路线轨道下的工程结构的沉降变形。方法适用于考虑工程项目的施工过程的测量结算变形的“小幅度和大幅波动”的特点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号