首页> 外文会议>International Conference on Energy and Environmental Protection >The Theory and Practice of Forepoling Pre-stressed system bolt in preventing the rib spalling
【24h】

The Theory and Practice of Forepoling Pre-stressed system bolt in preventing the rib spalling

机译:前压力系统螺栓防止肋骨剥落的理论与实践

获取原文

摘要

Based on the particularity of loose and broken of the surrounding rock of roadway, there will be rib spalling after excavating of roadway without support problem. Through analyzing for the specific reasons of the rib spalling, the theory of forepoling pre-stressed system and forepoling support project were put forward. The broken rock zone test in normal roadway support indicating that this technology can effectively prevent the rib spalling before and after digging, having good supporting effect and economic benefits.
机译:基于道路周围岩石松散和破碎的特殊性,在没有支持问题的道路挖掘后会有罗纹剥落。通过分析肋骨剥落的具体原因,提出了前砍的预应力系统和前置支持项目的理论。正常道路支持中的破碎岩区试验表明该技术可以有效防止挖掘前后肋骨剥落,具有良好的支持效果和经济效益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号