首页> 外文会议>International Conference on Energy and Environmental Protection >Large Section Open-off Cut Supporting Technology of Fully Mechanized Caving Mining for Carboniferous Extra-Thick Coal Seam
【24h】

Large Section Open-off Cut Supporting Technology of Fully Mechanized Caving Mining for Carboniferous Extra-Thick Coal Seam

机译:石炭系超厚煤层综采通矿综采通路的大段开关支撑技术

获取原文

摘要

In order to resolve the supporting problems of the open-off cuts with span of 10m in Tashan coal mine No.3~5 coal seams, this study investigated and analyzed the problems in the current open-off cuts supporting and the supporting parameters, and performed laboratory test and analysis to the coal and rock's mechanical properties. The open-off cut wall rock in Tashan mine has the problem of serious deformation and high possibility of sudden falling. After academic analysis and numerical calculation, a new supporting mode is designed for the supporting of large span open-off cuts: unite high strength anchor bar, combined anchor rope, W steel strip, metal mesh and concrete to form a group anchor seal effect, therefore maintain the tunnel wall rock's stability and safety. Engineering test was conducted at the 8105 working face open-off cuts, the anchor rope's anchorage force changes in the range of 140 ~ 160kN, the maximum delaminating value of the roof in anchorage zone is about 7mm, and the maximum roof-to-floor convergence is 38mm. The result shows that the proposed "anchor bar - combined anchor rope - concrete" supporting model improved the overall bearing capacity of the supporting structure, controlled the tunnel wall rock's deformation effectively, and also achieved the desired effect of the supporting design, ensured the safety of the large section open-off cuts.
机译:为了解决三雪煤矿3〜5煤层跨度跨越10米的开关削减的支持问题,本研究研究并分析了当前开关支撑和支撑参数的问题,以及对煤炭和岩石的力学性能进行了实验室测试和分析。塔山矿的开关切片岩石岩石具有严重变形和突然下跌的可能性。在学术分析和数值计算之后,设计了一种新的支撑模式,设计用于支撑大跨度开关切口:联合高强度锚杆,组合锚绳,W钢带,金属网和混凝土形成群锚封闭效果,因此,保持隧道壁岩的稳定性和安全性。工程测试在8105工作面开关切口进行,锚绳的锚固力在140〜160kN的范围内变化,锚固区屋顶的最大分层值约为7mm,以及最大屋顶到地板收敛为38毫米。结果表明,所提出的“锚杆 - 组合锚绳 - 混凝土”支撑模型提高了支撑结构的总承载能力,有效地控制了隧道壁岩变形,还达到了支撑设计的所需效果,确保了安全性大部分开关切口。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号