首页> 外文会议>International Conference on Energy and Environmental Protection >A Case Study of Retaining Wall using Pre-stressed High-strength Concrete (PHC) Pile for Deep Excavation Work
【24h】

A Case Study of Retaining Wall using Pre-stressed High-strength Concrete (PHC) Pile for Deep Excavation Work

机译:用预应力的高强度混凝土(PHC)桩进行挡土墙进行深度挖掘工作的案例研究

获取原文

摘要

With increasing land prices and a lack of space in urban areas in the Republic of Korea, urban construction sites require deeper and larger excavations. For this reason, the selection of an adequate retaining wall system is becoming more important than any other aspect of excavation work. Cast-in Place pile (CIP) method, one of construction methods for retaining walls, is generally selected in excavation work for urban projects. CIP has some disadvantages such as additional waterproof work and environmental. The Pre-stressed High-strength Concrete (PHC) pile method is a solution that attempts to resolve these disadvantages of the CIP method. This study aims to compare the CIP and the PHC method in terms of cost and time. It was found that applying the PHC pile method could reduce cost and time compared to CIP by case study.
机译:随着土地价格上涨和大韩民国城市地区缺乏空间,城市建筑工地需要更深层次和更大的挖掘。因此,选择足够的挡土墙系统的选择比挖掘工作的任何其他方面都变得越来越重要。铸造桩(CIP)方法,挡土墙的施工方法之一,通常在城市项目的挖掘工作中选择。 CIP有一些缺点,如额外的防水工作和环境。预应力的高强度混凝土(PHC)桩方法是试图解决CIP方法的这些缺点的解决方案。本研究旨在将CIP和PHC方法在成本和时间方面进行比较。有发现施加PHC桩法可以通过案例研究与CIP相比降低成本和时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号