首页> 外文会议>e-Manufacturing Design Collaboration Symposium >Quantify equipment capacity impacts induced by maximum waiting time constraint through simulation
【24h】

Quantify equipment capacity impacts induced by maximum waiting time constraint through simulation

机译:通过模拟量化最大等待时间约束引起的设备容量影响

获取原文

摘要

Maximum waiting time constraint is one of the most complex questions in wafer fabrication. The constraint setting will definitely induce equipment capacity loss. However, it's difficult to quantify the impacts precisely. This paper illustrates the approach to quantify equipment capacity loss induced by maximum waiting time constraint settings through simulation. With the model, we can prioritize the impacts, and put efforts to prolong the specifications of highest ones. Besides, equipment capacity can be estimated more precisely by applying the model results.
机译:最大等待时间约束是晶片制造中最复杂的问题之一。约束设置肯定会诱导设备容量损耗。但是,很难精确量化影响。本文说明了通过模拟通过仿真量化最大等待时间约束设置引起的设备容量损耗的方法。通过模型,我们可以优先考虑影响,并努力延长最高的规格。此外,通过应用模型结果,可以更精确地估计设备容量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号