FIRST YEAR INSPECTION REVIEW AND IMPLEMENTATION ON A HYDROGEN PLANT

机译:第一年检查审查和实施氢气植物

获取原文

摘要

Australian Standards and Regulations contain requirements for the first year inspection of new pressure vessels. Traditional inspection by direct vessel entry can incur major effort and costs. Alternatively, this inspection may be deferred under AS/NZS 3788 if determined acceptable to do so by using a Risk Based Inspection (RBI) process. Such a process was recently applied to the vessels in a new Hydrogen Plant. Technically justifiable deferrals on a number of vessels were produced and targeted Inspection Plans for the remaining vessels developed. Advanced non-intrusive inspection techniques were used on catalyst-filled vessels which further reduced shutdown costs. A major component material non-conformance was also identified thereby averting a potentially significant High Temperature Hydrogen Attack issue.
机译:澳大利亚标准和法规包含新的压力船舶第一年检查的要求。直接船只进入的传统检查可能会产生重大努力和成本。或者,如果通过使用基于风险的检测(RBI)过程可以达到可接受的话,可以在AS / NZS 3788下延迟该检查。最近将这种方法应用于新的氢气植物中的血管。在技​​术上,生产了许多船只的技术辩护的推迟,并针对剩余的船舶产生的检查计划。在催化剂填充的容器上使用先进的非侵入式检查技术,其进一步降低了关闭成本。还鉴定了一个主要的组分材料不符合,从而避免了潜在的显着的高温氢发作问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号