首页> 外文会议>SAE AeroTech Congress Exhibition >Control Charts for Short Production Runs in Aerospace Manufacturing
【24h】

Control Charts for Short Production Runs in Aerospace Manufacturing

机译:航空航天制造中的短生产运行控制图

获取原文

摘要

Statistical process control (SPC) has been extensively used in many different industries including automotive, electronics, and aerospace, among others. SPC tools such as control charts, process capability analysis, sampling inspection, etc., have definitive and powerful impact on quality control and improvement for mass production and similar production systems. In aerospace manufacturing, however, applications of SPC tools are more challenging, especially when these tools are implemented in processes producing products of large sizes with slower production rates. For instance, following a widely accepted rule-of-thumb, about 100 units of products are required in the first phase of implementing a Shewhart type control chart. Once established, it then can be used for process control in the second phase for actual production process monitoring and control. In many aerospace production processes, however, it requires that quality control measures be in place from the time that the first unit of product is produced. Certain types of control charts for self-starting (without the first phase) and for short production runs (as few as 3 units) have been developed by researchers and practitioners. They have been tested and used in places where traditional Shewhart control charts are difficult to apply. In this work, we used Monte-Carlo simulation to study the suitability of applying Q -chart, one of the available self-starting control charts, in comparison with I/MR- X chart for short production runs. The preliminary results suggest that a combination of Cusum Q -chart and Cusum I/MR- X chart be considered for better quality monitoring and control.
机译:统计过程控制(SPC)已广泛用于许多不同行业,包括汽车,电子产品和航空航天等。 SPC工具,如控制图,工艺能力分析,采样检验等,对质量控制和批量生产和类似生产系统的改进产生了明确和强大的影响。然而,在航空航天制造中,SPC工具的应用更具挑战性,特别是当这些工具在生产大尺寸的工艺中实施,具有较慢的生产率。例如,在广泛接受的拇指规则之后,在实施削弱型控制图表的第一阶段需要大约100个单位的产品。一旦建立,它就可以用于第二阶段的过程控制,以进行实际生产过程监控和控制。然而,在许多航空航天生产过程中,它要求从生产第一个产品的产品产生质量控制措施。研究人员和从业者开发了某些用于自动启动(没有第一阶段)和短生产运行的控制图(即,少至3个单位)。它们已经过测试并在难以申请的传统棚顶控制图表的地方使用。在这项工作中,我们使用Monte-Carlo仿真来研究应用Q -Chart的适用性,其中一个可用的自动启动控制图表之一,与I / MR-X图表进行了短期生产运行。初步结果表明,Cusum Q -Chart和CuSum I / MR-X图表的组合被认为是更好的质量监测和控制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号