首页> 外文会议>International Conference on Environmental and Agriculture Engineering >The Study on Water Management Crisis in Eastern Region of Thailand (Chantaburi and Rayong Provinces) in Period of 2009 - 2010
【24h】

The Study on Water Management Crisis in Eastern Region of Thailand (Chantaburi and Rayong Provinces) in Period of 2009 - 2010

机译:2009年 - 2010年泰国东部地区水管理危机研究 - 2010 - 2010年期间泰国(Chantaburi和Rayong Provinces)

获取原文

摘要

The participatory action research on water management crisis in eastern region of Thailand (Chantaburi and Rayong provinces) in period of 2009 – 2010 by “diverting water from Chantaburi to Rayong provinces project” was the Interdisciplinary management among the 4 sectors as 1) Council of Ministers 2) Ministry of Natural Resource and Environment 3) Ministry of agriculture and cooperation 4) Concern peoples from Chantaburi and Rayong provinces. The project had set the objective as following 1). Comparative study on water recourses in Chantaburi and Rayong provinces 2). Participate in the development of “Diverting water from Chantaburi to Rayong provinces project” The methodology of the research done by synthesized the collected data and participate in the said project by the researcher from 2009 until the end of 2010. The result conveyed that 1). Most of the people in Chantaburi province earn their living by agricultural production with opposite to industrial production in Rayong province which the water resources in Rayong province was quite low in natural rainfall but rather high in preserving reservoir but not enough. They need to solved the problem of water shortage crisis by divert water from Chantaburi province with higher in rainfall from 3,435.1 in Chantaburi than 1,366.4 millimeter/year in Rayong province respectively. The water reservoir in Rayong province had high utilization of water for industry section and also sub divert it to Chonburi province. 2). The researcher participate in water management crisis in eastern region of Thailand by Interdisciplinary management with the Thai Government agreed and provide with 3,992.85 million bath for Diverting water from Chantaburi to Rayong Province for resolved the problem. But Chantaburi provincial Administrative Organization and some agriculturist have agreed to against the said project, because of the shortage of water crisis still happened in Chantaburi province also. The concerned persons try to move forward by compromised with making reservoir in Chantaburi at the same time of diverting the water to Rayong province. The beneficial of the project can be divert the water from Chantaburi to Rayong provinces with the satisfaction of the people in Chantaburi province because of they can get the new reservoir in Chantaburi province nearly to be 3-4 reservoir in Chantaburi province for the future .
机译:泰国东部地区(Chantaburi和Rayong Provinces)的参与式行动研究2009 - 2010年“从Chantaburi转移到Rayong省份项目”是4个部门的跨学科管理,为1)部长理事会2)自然资源和环境部3)农业部和合作部4)关注山竹和罗勇省的人民。该项目将目标设置为以下目标。 Chantaburi和Rayong省份水资源的比较研究2)。参与发展“从Chantaburi转移到Rayong Propes项目”的方法,通过综合所收集的数据进行的方法,并于2009年从2009年从2009年参加了上述项目。结果表明了1)。 Chantaburi省的大多数人民通过与Rayong省的工业生产相反的农业生产赢得了罗勇省的水资源,在天然降雨中的水资源相当较低,但保存水库但不够高。他们需要通过从Chantaburi的3,435.1在Chantaburi中的降雨中从Chantaburi省转移到Chantaburi的3,435.1次乘以1,366.4毫米/年来解决水资源短缺危机问题。罗勇省水库利用工业段利用水,并将其转移到春武里省。 2)。研究人员通过跨学科管理参与泰国东部地区的水管理危机,泰国政府同意并提供39.92.85万浴室,用于从Chantaburi到Rayong省转移到Rayong省的水分。但少年省行政组织和一些农业师同意反对上述项目,因为水危机短缺仍然发生在山区省。有关人士试图通过在Chantaburi的制作水库同时将水库妥协,同时将水融入罗勇省。这些项目的有益可以从Chantaburi省的人民满意地将水从Chantaburi转移到Rayong省份,因为他们可以在Chantaburi Province的新水库近于Chantaburi省的3-4个水库。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号