There is a general consensus in forecast an increase of the worldwide demand for electricity of more than 70% to almost reach 32000 TWh by 2035. Consequently a large amount of new T&D lines and substations will have to be installed and the existing capacity will face upgrading with utilities pushing component manufacturers to quickly fulfill these demands but speed cannot be obtained at the expense of safety and reliability as last year's massive grid failure in India testified with strong economical, technical and social consequences. Major outages ask for the implementation of more stringent regulations in many countries and these situations push utilities to look for the evidence of testing as a way to demonstrate they work with due diligence in choosing equipment and technologies. Moreover construction of urban substations in big cities with intense population is always challenging and the reduction of substation footprint is a demanding need.
机译:预计将增加全球电力需求量超过70%的达到2035年的全球需求。因此,必须安装大量新的T&D线路和变电站,现有能力将面临升级利用公用事业公司推动组件制造商快速满足这些需求,但由于牺牲了安全性和可靠性的速度不能以较强的经济,技术和社会后果作证,以牺牲安全性和可靠性为代价而获得速度。主要中断要求在许多国家和这些情况下实施更严格的规定,这些情况推动公用事业,以寻找测试的证据,以证明他们在选择设备和技术方面的尽职调查工作。此外,群体中城市的城市变电站始终挑战,变电站足迹的减少是一种苛刻的需求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号