Operations in the Gulf of Mexico (GOM) areaffected during the months of June throughNovember by the weather, as hurricanes aregenerated and come into the GOM, creating theneed to plan abandonments to avoid harm to anypersonnel, environment and minimize damage tofacilities. During June 2010, while executing ascale clean out operation on a platform with1.25'' coiled tubing (CT), the pipe got stuck. After11 days of troubleshooting, it was required toevacuate the platform due to a hurricane thatwas approaching. A management of change wasdeveloped to safely secure the CT string atsurface, which would allow for abandonmentwhile maintaining well control (WC). During thisprocess three options were analyzed: the firstoption was to add additional support to theinjector head(IH) jacking frame and leave thepipe stabbed in, this option was rejectedbecause it would not guarantee WC in the eventthat the storm takes down the IH.The second option was to secure the CT with theBlow Out Preventers(BOP) then shear it, and rigdown the IH. This Approach provided WC, but itcreated additional risk and limitations whenresuming the retrieval operation after the storm.The third option was to secure the CT at the BOPand cut it above the IH. With the removal of theIH, this would leave the section of pipe that waspreviously across the chains and riser freeabove the BOP. An appropriate valve would thenbe connected to the CT stub end, for WC. Furthermore, by sliding a riser section over theCT stub and making up a gate valve and nightcap would minimize the exposure to the storm.Finally, the riser could be secured to the deck.After analyzing available options, the thirdalternative was recommended and approved bythe BOEMRE; as this option addressed WC andallowed safe recovery by re-stabbing the pipeback into the IH, and rigging up the requiredequipment to proceed with the pipe recoveryoperation.
机译:墨西哥湾(GOM)在六月几个月的墨西哥湾(GOM)在六月的几个月内通过天气,飓风是飓风,并进入GOM,创造出来,计划遗弃避免伤害任何伤害的损伤。在2010年6月期间,在用1.25''盘管(CT)的平台上执行ASCALE清理操作,管道已卡住。在10天后进行故障排除,由于飓风接近时,需要使用平台。改变的管理是安全的,以安全地保护CT字符串atsurface,这将允许放弃维持良好控制(WC)。在此过程中分析了三种选择:FirstOption是向TheInmictor头部(IH)顶jack框架添加额外的支持并留下刺伤,此选项被拒绝,因为它不会保证Revel,风暴取下IH的情况下。第二选项是用防止预防器(BOP)固定CT,然后剪切,并缩略IH。这种方法提供了WC,但是当风暴之后的检索操作时,它的额外风险和限制。第三种选项是将CT固定在Bopand上方的XOP时。随着炎症的去除,这将使管道部分在锁链和立管Freabove中留下。然后将适当的阀门连接到WC的CT短端。此外,通过将提升管部分滑动,通过将提升管部分滑动并构成闸阀和夜间切换将最小化暴露于风暴的暴露。最后,可以将提升器固定到甲板上。在分析可用选项的情况下,推荐的第三种替代品;由于此选项通过将管钩重新刺入IH,并索取所需的机会来验证安全恢复,并达到安全恢复,并进行管道回收处理。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号