首页> 外文会议>International Conference on Civil Engineering and Transportation >Temporary Support Design on Large-span Casting Box Girder Of the Songpu Bridge
【24h】

Temporary Support Design on Large-span Casting Box Girder Of the Songpu Bridge

机译:松布桥大跨度铸造箱梁的临时支持设计

获取原文

摘要

By the study of construction of casting box girder of Songpu Bridge in Harbin, and the actual site geology, hydrology and the corresponding norms, this paper designed temporary support with the method of allowable stress. It was proved that the temporary support met the need of the site construction, both to ensure casting construction quality, but also save construction costs and speed up the construction progress, which provided a new way for the construction of large-span continuous box girder.
机译:通过研究哈尔滨松浦桥梁铸件梁梁的研究,以及实际地质地质,水文和相应规范,本文设计了允许允许应力的方法临时支持。事实证明,临时支持符合现场建设的需求,无论是为确保铸造施工质量,还节省了建设成本,加快了建设进步,为大跨度连续箱梁建设提供了一种新的途径。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号