首页> 外文期刊>International Journal of Sustainable Built Environment >Integrating a fuzzy-logic decision support system with bridge information modelling and cost estimation at conceptual design stage of concrete box-girder bridges
【24h】

Integrating a fuzzy-logic decision support system with bridge information modelling and cost estimation at conceptual design stage of concrete box-girder bridges

机译:在混凝土箱梁桥概念设计阶段将模糊逻辑决策支持系统与桥梁信息建模和成本估算相集成

获取原文
       

摘要

Integrating 3D bridge information modelling (BrIM) with construction technologies had inspired many researchers for the past decade. In this study, research objectives are intended to demonstrate the viability of integrating a 3D computer-aided design (3D-CAD) model with a structural analysis application and bridge cost estimation framework without compromising interoperability matters. An integrated model that relates a fuzzy logic decision support system with cost estimation for concrete box-girder bridges is presented. Model development methodology comprises an integrated preliminary cost estimation system (IPCES), and complex quality functions and deployment of a multi-criteria decision making (MCDM) approach. An actual case project is used to validate and illustrate model corresponding estimating capabilities. The proposed model is engineered to enhance existing techniques implemented by bridge stakeholders and designers to prepare cost estimates at the conceptual design stage by taking into consideration box-girder bridge project site preparations, substructure, and superstructure. The proposed model is anticipated to be of major significance to designers and its contribution resides into the integration of BrIM technologies with cost estimation approaches.
机译:在过去的十年中,将3D桥梁信息建模(BrIM)与建筑技术相结合启发了许多研究人员。在本研究中,研究目标旨在证明在不影响互操作性的前提下,将3D计算机辅助设计(3D-CAD)模型与结构分析应用程序和桥梁成本估算框架相集成的可行性。提出了一种将模糊逻辑决策支持系统与混凝土箱梁桥的成本估算联系起来的集成模型。模型开发方法包括一个集成的初步成本估算系统(IPCES),复杂的质量功能以及多准则决策方法(MCDM)的部署。一个实际的案例项目用于验证和说明模型对应的估计能力。提出的模型旨在增强桥梁利益相关者和设计人员实施的现有技术,以通过考虑箱梁桥项目现场准备工作,下部结构和上部结构来在概念设计阶段准备成本估算。预计所提出的模型对设计人员而言将具有重要意义,其贡献在于将BrIM技术与成本估算方法相集成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号