首页> 外文会议>International Conference on Civil Engineering and Transportation >THE SECOND MAINTENANCE AND STRENGTHENING OF YONGHE BRIDGE
【24h】

THE SECOND MAINTENANCE AND STRENGTHENING OF YONGHE BRIDGE

机译:永和桥的第二次维护和加强

获取原文

摘要

Tension rocker bearing (TRB) cables installed at auxiliary piers were critical members to sustain the structural system in a prestressed concrete cable-stayed bridge. Once these cables fractured or broken, its structural system would be transferred. Based on diseases caused by fracture of TRB cables in Yonghe Bridge, corresponding maintenance or strengthening measures were described in detail. These measures included replacement of TRB cables, strengthening of the closure segment of main girder at each side span, and adjustment of stay cable forces. Monitoring results showed that, its structural system was finally and completely rehabilitated, and the safety factor of new TRB cables is enough under the most unfavorable load combination. Moreover, the line shape of main girder and the inclined displacement at the top of each pylon were improved effectively. Thus, Yonghe Bridge accumulated some valuable experience for maintenance or strengthening of existing prestressed concrete cable-stayed bridges, and also made a useful exploration.
机译:安装在辅助码头的张力摇杆轴承(TRB)电缆是在预应力混凝土斜拉桥中维持结构系统的关键构件。一旦这些电缆破碎或破裂,其结构系统将被转移。基于由永河桥梁的TRB电缆断裂造成的疾病,详细描述了相应的维护或加强措施。这些措施包括更换TRB电缆,在每个边跨度加强主梁的闭合段,以及保持缆线的调整。监测结果表明,其结构系统最终恢复,新TRB电缆的安全系数在最不利的负载组合中足够。此外,有效地提高了主要梁的线形状和每个塔架顶部的倾斜位移。因此,永河桥积累了一些有价值的维护或加强现有预应力混凝土缆车座的桥梁的经验,并进行了有用的探索。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号