首页> 外文会议>International Conference on Civil Engineering and Transportation >Study on Effect of Blasting Vibration on Surface of Particles in Urban Hard Rock Tunnel
【24h】

Study on Effect of Blasting Vibration on Surface of Particles in Urban Hard Rock Tunnel

机译:爆破振动对城市硬岩隧道粒子表面的影响研究

获取原文

摘要

Put the first Phase Project of Qingdao Metro (line 3) civil 03 bid section TAI-YAN interval of blasting construction as the background In this paper, select the test section to blasting test, in ground position on the ais of the tunnel workface arrange the measuring points and location of measuring points remain the same. Based on the measured data, studied on the law of blasting vibration of cutting parts of each of the driving cycle. The research result show that the cutting part of vibration velocity peak appeared in behind the tunnel woekface 1~3m; Rear vibration composite speed of the tunnel workface is speed of the tunnel workface is 1.0~1.4 times in front of the particle vibration composite speed; The main vibration frequency in front of tunnel workface and rear particle are above 15HZ.
机译:把青岛地铁第一阶段项目(3号线)民用03出价爆破截面间隔的爆破结构为背景本文,选择测试部分到爆破试验,在地上的隧道工作场的地面位置安排测量点和测量点的位置保持不变。基于测量数据,研究了每个驾驶循环的切割部分的爆破振动定律。研究结果表明,振动速度峰的切割部分出现在隧道Woekface后面1〜3M;隧道工作面的后振动复合速度是隧道工作面的速度为1.0〜1.4次的粒子振动复合速度;隧道工作面和后粒径前的主要振动频率高于15Hz。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号