首页> 外文会议>International Conference on Structures and Building Materials >Application of fuzzy comprehensive evaluation method in engineering project risk management
【24h】

Application of fuzzy comprehensive evaluation method in engineering project risk management

机译:模糊综合评判方法在工程项目风险管理中的应用

获取原文

摘要

According to the current situation and problems of the risk response of China's construction market, from the selection of risk factors and its weight, expert evaluation score, and other aspects, and applies the fuzzy comprehensive evaluation method of the system thinking, analyzes the reliability of the risk response plan, studies the application of the fuzzy comprehensive evaluation method in more risk solutions to select, and the results show that the comprehensive evaluation value of each plan is organic combined the experience of experts with the strict quantitative analysis, and enhance the evaluation results of scientific and reasonable and accuracy.
机译:根据中国建筑市场风险反应的现状和问题,从危险因素的选择及其体重,专家评价得分等方面,并应用了系统思维的模糊综合评价方法,分析了可靠性风险响应计划,研究模糊综合评估方法在更大的风险解决方案中的选择,结果表明,每个计划的综合评价价值是有机的,使专家的经验与严格的定量分析,提升评估科学合理和准确性的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号