首页> 外文会议>International Conference on Structures and Building Materials >Computer Simulation Forecast of the Markov Chain for Payback Period of Construction Projects Investment
【24h】

Computer Simulation Forecast of the Markov Chain for Payback Period of Construction Projects Investment

机译:建设项目投资回收期马尔可夫链电脑仿真预报

获取原文

摘要

The investment payback period of construction projects is an important index that evaluate and measure economic effect of project investment. It is difficult that the investment payback period of construction projects is calculated generally using analytic method.We established the mathematical model of the payback period, the annual net cash flows are Markov chains. According to the similar projects, collected net yearly cash flow and each quarter net cash flow, A one-step transition probability matrix was described by using the computer simulation of Markov chains, forecasted the dynamic and static payback period of construction projects investment, so as to provide the scientific basis data for decision makers.
机译:建设项目的投资回收期是评估和衡量项目投资经济影响的重要指标。难以使用分析方法计算建筑项目的投资回收期。我们建立了回收期的数学模型,年度净现金流量是马尔可夫链。根据类似的项目,收集的净年度现金流量和每季度净现金流量,通过使用马尔可夫链的计算机仿真,预测了建设项目投资的动态和静态投资时期,描述了一步的转换概率矩阵。为决策者提供科学基础数据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号