首页> 外文会议>International Conference on Environment Science and Biotechnology >Numerical Simulation of the Groundwater in Bulang River- Red Stone Bridge Water Source
【24h】

Numerical Simulation of the Groundwater in Bulang River- Red Stone Bridge Water Source

机译:粉河红石桥水源地下水的数值模拟

获取原文

摘要

In order to put forward a reasonable mining scheme to ensure the safety of Bulang River-Red Stone Bridge water source, the standard visualization software Visual MODFLOW is adopted to simulate the groundwater flow in the study area. The model identification and verification results indicate that the model can reflect the actual hydrogeology conditions, and can be used to forecast groundwater flow. Based on comparative analysis of the prediction results of mining schemes, a reasonable scheme with exploitation quantity of 35000 m3/d is determined to ensure the normal operation of the water source, under which neither the local ecological environment nor the Hailiutu River flow is influenced.
机译:为了提出合理的采矿计划,以确保船隆河红石桥水源的安全性,采用标准可视化软件视觉模型来模拟研究区域的地下水流动。模型鉴定和验证结果表明,该模型可以反映实际的水力地理条件,可用于预测地下水流动。基于对采矿计划预测结果的比较分析,确定具有35000 M3 / d的合理方案,以确保水源的正常运行,其中局部生态环境和海盗河流量都没有受到影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号