首页> 外文会议>Water Quality Technology Conference and Exposition >PUTTING THE PIECES TOGETHER, STANDARD OPERATING PROCEDURES FOR LEAD SERVICE LINE REPLACEMENT
【24h】

PUTTING THE PIECES TOGETHER, STANDARD OPERATING PROCEDURES FOR LEAD SERVICE LINE REPLACEMENT

机译:将件放在一起,标准操作程序进行铅服务线更换

获取原文

摘要

Having standard operating procedures (SOPs) for lead service line replacement is an important element of utility distribution system operations practice. Such SOPs encompass key skills for distribution system operators that translate the state of the science on reducing customer's exposure to lead into practice in the field. The following paper provides an initial outline for general utility SOPs for lead service line replacement (LSLR). The contents of these SOPs will be developed with input from several utility volunteers.
机译:具有标准操作程序(SOP)的铅服务线更换是公用事业分配系统运营实践的重要因素。这样的SOP包括分配系统运营商的关键技能,这些运营商转化了减少客户暴露的科学状态,以导致现场实践。以下文件为铅服务线更换(LSLR)提供了通用公用事业机器的初始概要。这些SOP的内容将通过来自多个实用程序志愿者的输入来开发。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号