首页> 外文会议>SSMSSD10 >Cost comparison of JIT and EMQ in production practice : using a new EMQ/JIT production-run model
【24h】

Cost comparison of JIT and EMQ in production practice : using a new EMQ/JIT production-run model

机译:JIT和EMQ在生产实践中的成本比较:使用新的EMQ / JIT生产运行模型

获取原文

摘要

from previous study of economic manufacturing quantity (EMQ)/just-in-time (JIT) production run model, some important cost components under the inventory management systems were ignored by the models. This paper builds new EMQ/JIT model considering out-stock cost, and figured out new EMQ/JIT cost indifference points, suggesting that JIT approach is not always prefered to EMQ approach in practice even when the JIT purchasing approach can capitalize on physical plant space reduction.
机译:从以前的经济制造数量(EMQ)/即时(JIT)生产运行模式的研究,模型忽略了库存管理系统下的一些重要成本组件。本文建立了考虑载体成本的新EMQ / JIT模型,并找出了新的EMQ / JIT成本漠不关心点,表明即使JIT采购方法能够利用物理厂房资本化即使在实践中并不总是优先考虑JIT方法。减少。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号