A new fuzzy approach for defining multi-purpose criticality of activities in PERT

机译:一种新的模糊方法,用于定义Pert中的活动的多用途

获取原文

摘要

In this paper a new fuzzy approach is developed for defining the general criticality of activities where some other features such as probability of finishing on time zone, probability of impact, impact threat and ability to retaliate are considered a s criticality factors of activities in project management process. In this way the risky situation (vulnerability) of activities are calculated by using fuzzy inference system. Activities are prioritized and classified by means of a fuzzy decision making procedure. The effect of considering such factors on project duration and cost are compared with classic PERT - where only the slack times are considered as criticality factors of activities -by means of Mont Carlo simulation.
机译:在本文中,开发了一种新的模糊方法,用于定义活动的一般临界性,其中一些其他特征如在时区上整理的概率,影响的可能性,影响威胁和报复的能力被视为项目管理过程中活动的关键因素。以这种方式,通过使用模糊推理系统计算活动的风险状况(漏洞)。活动是通过模糊决策程序进行的优先级和分类。考虑到项目持续时间和成本等因素的效果与经典的pert进行了比较 - 那里只有松弛时间被视为蒙特卡罗模拟的过程的关键因素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号