首页> 外文会议>International conference on logistics, informatics and service science >THE INFORMATION CONSTRUCTION MANAGEMENT ABOUT INITIAL SUPPORT OF HIGH-SPEED RAILWAY TUNNEL IN LOESS REGION
【24h】

THE INFORMATION CONSTRUCTION MANAGEMENT ABOUT INITIAL SUPPORT OF HIGH-SPEED RAILWAY TUNNEL IN LOESS REGION

机译:黄土地区高速铁路隧道初步支持的信息施工管理

获取原文

摘要

During the process of tunnel construction, it is very necessary to insist on the information construction management and take measures. Taking the Humaling tunnel as the background, mechanical properties of its typical cross section’s surrounding loess are comprehensive researched by in-situ monitoring and FEM calculation, and then explored the mechanical rules of the initial support for high-speed railway tunnel in loess . The initial support effects can be evaluated; meanwhile several corresponding optimization measures are put forward aiming at the weaknesses of the initial support process. Based on the above, some advices and techniques are provided for the initial support in the similar loess region.
机译:在隧道建设过程中,坚持信息施工管理并采取措施是非常必要的。采用立式隧道作为背景,其典型的横截面周围黄土的机械性能通过原位监测和有限元计算研究,然后探索了黄土中高速铁路隧道初始支持的机械规则。可以评估初始支持效果;同时,提出了几种相应的优化措施,旨在旨在初始支持过程的弱点。基于上述情况,提供了一些关于类似黄土地区的初始支持的建议和技术。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号