首页> 外文会议>Society of Petroleum Engineers Deepwater Drilling and Completions Conference >GOM Deepwater Field Development Challenges at Green Canyon 468 Pony
【24h】

GOM Deepwater Field Development Challenges at Green Canyon 468 Pony

机译:GOM Deepwater领域发展挑战绿色峡谷468小马

获取原文

摘要

Gulf of Mexico (GOM) deep water has proven in recent years to be one of the most prolific oil production provinces in the world. The bulk of the new reserves and production to date in this area flow from subsalt, Miocene reservoirs at fields including Shenzi, Tahiti, Thunderhorse, and others. In the summer of 2005 Hess Corporation entered this arena and drilled the Green Canyon 468 ‘Pony’ discovery well. Information collected during subsequent appraisal drilling revealed significant insight into subsalt oil reservoirs which exist at depths between 28,000’ and 31,000’ TVD in this area. Geologic, reservoir engineering, facilities, and well construction studies have since resulted in a degree of clarity around the technical and economic viability of field development going forward. Of critical importance is addressing structural uncertainty below salt across Blocks 468 and 469. To reduce this uncertainty further appraisal drilling was approved late in 2009 on the eastern flank of the field. In addition to further structural and reservoir definition, Pony 3 objectives included a more robust casing design with deeper settings and larger diameter hole sections below salt to further confirm feasibility of future production wells. The 2010 program also included the utilization of a six generation dynamically positioned drill ship Stena Forth which provided a valuable advantage versus the single activity, moored semi-submersible utilized on earlier wells. Challenges inherent to ultra-deep wells in deepwater have been well documented in recent years. Hence, this paper will focus primarily on Pony well construction and deepwater field development planning. A number of key design issues will be highlighted including pore pressure/fracture gradient regression, casing design, bitumen (tar) mitigation, and salt creep mitigation. Incorporation of lessons learned and best practices from the substantial history of other deepwater operators has been a priority throughout this effort. Engineering and design in partnership with other operators is recognized as a critical element to ensure success in this challenging environment.
机译:墨西哥湾(GOM)深水已被证明是近年来成为世界上最丰富的石油产量之一。在包括Shenzi,Tahiti,Thounderhorse等领域的领域的Subsalt,Miocene Chockos的这个区域的大部分新的储备和生产。在2005年夏天,Hess Corporation进入了这个竞技场,并钻了绿色峡谷468'Pony'的发现。在随后的评估钻井期间收集的信息揭示了对在该地区28,000'和31,000英寸TVD之间存在的余下的石油储层的重要洞察。地质,水库工程,设施和良好的施工研究,此后导致了围绕现场发展的技术和经济可行性的清晰度。至关重要的重要性正在跨块468和469解决盐下方的结构性不确定性。为了减少这种不确定性,进一步评估钻探在2009年批准了该领域的东部侧翼。除了进一步的结构和水库的定义,小马3目标包括一个更坚固的外壳设计具有较深的设置和较大直径孔部下面盐的未来生产井进一步证实可行性。 2010年计划还包括利用六代动态定位的钻船Stena,该练习练位为单一活动提供了有价值的优势,在较早的井上停泊了半潜水。近年来,深水上超深井固有的挑战已经充分记录。因此,本文将主要集中在小马井建设和深水场发展规划上。将突出多个关键设计问题,包括孔隙压力/断裂梯度回归,套管设计,沥青(焦油)缓解和盐蠕变缓解。在整个深水运营商的实质性历史中纳入经验教训和最佳实践一直是在这项工作中的优先事项。工程设计与其他运营商的合作被认为是一个关键因素,以确保在这个充满挑战的环境中获得成功。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号