Flare Tip Replacement by Helicopter: Methodology Selected Based on HSE Risk Reduction

机译:通过直升机提示更换火炬:根据HSE风险减少选择的方法

获取原文

摘要

The best way to reduce risk is to eliminate it all together. Total Abu Al B Bukhoosh (TABK) is a mature field being operated for many years, yet new technologies and innovative sollutions are constantly fed into our operations and maintenance toolbox. Through use of an innovative approach for maintenance activities, Total ABK reduced by 90% the overall manhours of exposure during an offshore flare tip replacement. TABK compared two alternatives for the flare tip replacement program. The first was to perform the operation using conventional heavy load crane barge methodology. The activity is performed by landing the barge near the flare header and removing the tip with the crane. The second option was to perform the replacement by helicopter rather than crane barge, using the "long line" flying technique (sometime referred to as "Vertical Reference"). This methodology is very innovative and is performed by expert crews only as it requires experienced hands, high-tech equipment and specialized guidance tools. There are many benefits using the helicopter approach, most impressive of which is the overall reduction in workplace exposure. Total hours for the helicopter operation including on-site prep time was 123 hours, versus an estimated 2880 hours for the crane barge approach. Additional benefits include reduced down time (two field days vs. three weeks), reduced chance of weather delays and up to 7 times less CO2 emissions. HSE performance improvement doesn’t mean additional cost as this approach was 1/3 of the cost of the crane barge approach.
机译:降低风险的最佳方法是消除它的全部。总ABU AL B Bukhoosh(Tabk)是一款成熟的领域,多年来运行,但新技术和创新的Sollue都不断进入我们的运营和维护工具箱。通过使用创新的维修活动方法,总ABK在离岸火光尖端更换期间减少了90%的曝光整体曝光。虎虎比较了闪光提示更换程序的两个替代方案。首先是使用传统的重载起重机方法进行操作。该活动是通过将驳船在喇叭头附近落地并用起重机移除尖端来进行。第二种选择是使用直升机而不是起重机驳船进行更换,使用“长线”飞行技术(有时称为“垂直参考”)。这种方法是非常创新的,仅由专业人员执行,因为它需要经验丰富的手,高科技设备和专业的指导工具。使用直升机的方法有许多好处,最令人印象深刻的是工作场所曝光的总体减少。直升机运行的总时间包括在现场准备时间为123小时,而且估计的起重机驳船方法为2880小时。额外的福利包括减少停工时间(两个场日与三周),减少天气延误的可能性,多达7倍的二氧化碳排放量。 HSE性能改进并不意味着额外成本,因为这种方法是起重机驳船方法的成本的1/3。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号