首页> 外文会议>Society of Petroleum Engineers Trindad and Tobago Energy Resources Conference >Planning, Execution Surveillance of Enhanced Oil Recovery Projects
【24h】

Planning, Execution Surveillance of Enhanced Oil Recovery Projects

机译:加强石油恢复项目的规划,执行和监测

获取原文
获取外文期刊封面目录资料

摘要

Trinidad and Tobago’s onshore acreage has seen many stages of development. Currently, most onshore fields are well into their mature phase with the application of various forms of artificial lift being applied. Secondary recovery, through water- flooding, has been used in some fields with limited success whilst tertiary recovery methods, namely steam injection, have been more successful. These projects have been few and far between since there is a significant amount of acreage still to be considered for Enhanced Oil Recovery (EOR). An analysis of historical data has suggested that the application of modern day EOR screening, reservoir characterization tools and simulation would address some of the uncertainties that posed problems in the past. An increasing number of mature oilfield acreage is being leased out by the state to private investors/operators. These entities must be prepared to efficiently exploit these mature blocks by optimizing current production operations, performing recompletions, in-fill drilling but most importantly by adding significant reserves through EOR projects. Many modern considerations within the feasibility stage through to health, safety and environment application must now be adhered to, for successful approvals from government regulators. This paper provides a detailed outline of the different stages and processes that companies can follow or modify, to suit their reservoir management style, in pursuing successful EOR outcomes. This paper also addresses the importance of EOR screening, project management and surveillance techniques. Processes and recommendations developed from this work can be applied by any oilfield company who wishes to begin or expand their EOR project.
机译:特立尼达和多巴哥的陆上面积已经看到了许多发展阶段。目前,大多数陆地领域都与应用各种形式的人工升力应用于它们的成熟阶段。二次恢复,通过洪水,已经在一些现成有限的领域中使用,而第三次恢复方法,即蒸汽喷射,更成功。这些项目几乎没有,因为仍有大量的种植面积仍被认为是增强的储油(EOR)。历史数据的分析表明,现代日EOR筛选的应用,储层特征工具和模拟将解决过去构成问题的一些不确定性。越来越多的成熟油田面积被国家租赁到私人投资者/运营商。必须准备通过优化当前生产操作,执行重新完成,但最重要的是通过添加通过EOR项目的重要储备来有效地利用这些成熟块。在可行性阶段内的许多现代考虑因素到健康,安全和环境申请必须遵守政府监管机构的成功批准。本文提供了有关公司可以遵循或修改的不同阶段和流程的详细概要,以旨在追求成功的EOR结果。本文还涉及EOR筛选,项目管理和监控技术的重要性。从本工作中制定的流程和建议可以由任何希望开始或扩展其EOR项目的油田公司应用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号