首页> 外文会议>International Conference on Multimedia Technology >Site Test of Siltation For Foundation Trench of Immersed Tunnel of Hong Kong-Macau-Zhuhai Bridge
【24h】

Site Test of Siltation For Foundation Trench of Immersed Tunnel of Hong Kong-Macau-Zhuhai Bridge

机译:港澳珠海大桥浸没隧道基础沟壑区淤积现场试验

获取原文

摘要

The studies used a test foundation trench to carry site measurement of siltation of Hongkong-Zhuhai-Macau Bridge. A test foundation trench which was 100-meter-long and 21-meterwide was excavated near the west artificial island. The medial axis of trench was consistent with the designed axis of immersed tunnel. The data of 12-month site measurements indicates siltation happened on trench bottom and surface of trench slopes. North slope is more obvious than south slope. There was no obvious siltation on east and west slope. It has little chance that serious siltation happens on foundation trench of immersed tunnel after storm surge.
机译:研究用来试验基础沟渠携带香港 - 珠海桥梁淤积现场测量。在西部人工岛附近挖掘出100米长的测试基础沟渠。沟槽的内侧轴与设计的浸没隧道的设计轴一致。 12个月的站点测量的数据表示诸如沟槽底部和沟槽表面上发生的淤积。北坡比南坡更明显。东部和西坡没有明显的淤泥。在暴风雨过后,它几乎没有机会在浸没的隧道的基础沟中发生。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号