Deepwater Gas Fields: a Review of Current Field Development Options, Enabling Technologies and Main Challenges

机译:深水天然气领域:对当前现场开发选择的综述,实现技术和主要挑战

获取原文

摘要

Large, and sometimes very large, gas discoveries in deep and ultra deep waters have occurred over the past years in different geographic areas across the world. Some of these discoveries are being developed at present using 'Subsea to Beach', floating LNG or other options that require combinations of subsea tie-backs and offshore host(s). The choice on how to develop one or more deepwater gas reservoirs depends both on technical factors, including the readiness level and the applicability ranges of some key enabling technologies, and on non-technical factors, such as geopolitics considerations, market conditions and risks. This paper presents the most frequently encountered field development options and discusses their advantages and disadvantages. Examples of real projects are also presented, making use of public domain information when available. Scientific literature has been searched to collect information on past and ongoing projects. Press releases and other sources have been investigated to double-check and ensure consistency of the gathered information. The key technologies considered 'true enablers' for this kind of project are presented and briefly discussed. More focus is given to the readiness level of these technologies and to their current applicability range. For 'subsea to beach' this range is perceived to be within 200km from the shore and up to 1,500m water depth. Recent projects are understood to push the water depth limit up to 2,500m, while it might be more difficult to extend the step-out distance from shore beyond the 200km limit. New technologies are also discussed as possible future enablers. Non-technical factors are then studied due to the fact that some of the challenges that can be encountered in developing large offshore gas reservoirs are not technical in nature. Examples of these risks are delays in the project schedule and overall cost overruns. These non-technical challenges need to be taken into account while selecting the proper development option.
机译:大,有时非常大,深水和超深水天然气发现发生在过去几年在世界各地不同的地理区域上。有些新发现正在目前开发利用“海底到海滩”,浮动LNG或需要海底领带的挫折和离岸主机(或多个)的组合,其他的选择。如何开发一个或多个深水气藏的选择取决于技术因素,包括准备水平和一些关键使能技术的应用范围,并在非技术因素,如地缘政治的考虑,市场条件和风险两者。本文介绍了最常遇到的油田开发方案,并讨论了它们的优点和缺点。实际项目的例子还提出,当可利用的公共领域的信息。科学文学已搜索到过去的和正在进行的项目收集信息。新闻稿和其他来源进行了调查,以仔细检查,并确保所收集的信息的一致性。认为是“真正的推动者”这类项目的关键技术介绍和简要讨论。更注重的是这些技术的准备水平,并在当前的适用性范围。关于“海底到海滩”这个范围被认为是从岸上200公里内和高达1500米水深。最近的项目被理解为推动水深极限可达2500米,而它可能会更难以从岸边延伸失步的距离超过200公里的限制。新技术还讨论了未来可能的推动者。那么非技术因素进行了研究,由于这样的事实,一些可以在开发大型海上气藏中遇到的挑战是不是技术性的。这些风险的例子是在项目的进度和总体成本超支延误。这些非技术挑战需要而选择合适的发展方案被考虑在内。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号