首页> 外文会议>Asian International Conference on Fluid Machinery >STUDY ON ECONOMICAL OPERATION OF LARGE PUMP STATION BY ADJUSTING OPERATION DUTY
【24h】

STUDY ON ECONOMICAL OPERATION OF LARGE PUMP STATION BY ADJUSTING OPERATION DUTY

机译:通过调整操作义务的大型泵站经济运行研究

获取原文

摘要

The step pump stations in Eastern Route of South-to-North Water Diversion Project of China should realize economical operation by adjusting blade angle or adjusting rotational speed because of long annual run time and high running cost. Especially, the head of source pump station varies frequently and in a wide range, comprehensive economical operation by adjusting rotational speed and blade angle should be realized. The pump assembly efficiency characteristics were analyzed. The economical operation schemes and feasibilities were studied. The comprehensive economical operation theory of large pump station by adjusting rotational speed and blade angle were advanced for the first time. The results indicate that pump assembly high efficiency area is at small discharge side of pump high efficiency area, pump assembly efficiency of source pump station could increase by 1-5 percentage points by adjusting blade angle and 10-20 percentage points by adjusting rotational speed. Compared with economical operation by sole adjusting rotational speed or sole adjusting blade angle, pump assembly efficiency could increase by 1-5 percentage points again by comprehensive economical operation by adjusting rotational speed and blade angle.
机译:中国南北省北方地分流项目东部路线的步进泵站应通过调整叶片角度或调整转速来实现经济操作,因为长期运行时间和高运行成本。特别是,通过调节转速和叶片角度,源泵站的头部经常且众多的经济操作应该实现。分析了泵组件效率特性。研究了经济的运营计划和可行性。通过调整转速和叶片角度的大型泵站综合经济运行理论首次提前。结果表明,泵组件高效率面积处于泵浦高效率区域的小放电侧,通过调节旋转速度调节叶片角和10-20个百分点,源泵站的泵组件效率可以增加1-5个百分点。通过鞋底调整转速或鞋底调整叶片角度的经济操作相比,通过调整转速和叶片角度,泵组件效率可以通过全面的经济操作再次增加1-5个百分点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号