首页> 外文会议>International Conference on Uranium >INSTRUMENTATION DATA MANAGEMENT PRIORITIZATION USING GEOHAZARD RISK MANAGEMENT
【24h】

INSTRUMENTATION DATA MANAGEMENT PRIORITIZATION USING GEOHAZARD RISK MANAGEMENT

机译:仪表数据管理利用地质风险管理的优先级

获取原文
获取外文期刊封面目录资料

摘要

Many methods of geohazard risk management have been developed for various applications, including for mining industries and protection of highway infrastructure. The most common instrumentation used for management of geohazards is vibrating wire piezometers, slope inclinometer casings, strain gauges, and weather stations (a partial list). Monitoring requirements for instrumentation typically depends on the potential risk of a monitoring site. Alternatives for monitoring vary from occasional manual monitoring to sensors connected with near real-time monitoring capability and alarms that automatically distribute notifications to defined individuals. This paper describes a few common geohazard risk management methods used in the mining industry, the monitoring options that are available, and some considerations when developing monitoring plans.
机译:为各种申请制定了许多地质曲线风险管理方法,包括用于采矿行业和高速公路基础设施保护。用于地质锯齿的管理最常见的仪器是振动电线压电仪,斜坡倾斜度计壳体,应变仪和气象站(部分列表)。仪器的监测要求通常取决于监测网站的潜在风险。监控的替代方案因偶尔的手动监控而异的传感器与接近实时监控功能和警报自动分发通知的传感器。本文介绍了采矿业中使用的一些常见地质曲目风险管理方法,可提供的监测选项以及开发监测计划时的一些考虑因素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号